seven construction workers standing on white field

Construction Projects

Burdur Yeşilova Flood Protection 3rd Group Construction Manufacturing

The project involves the construction of a 3000-meter stone-walled canal, complemented by 5 termination benches. It includes the installation of 12 culverts and 3 bridges to ensure proper drainage and water flow. Additionally, the project encompasses a 6000-meter earth canal and a 4000-meter stone-fortified canal for increased durability and stability. A 200-meter prefabricated culvert and a 200-meter grilled system stonewall channel are also part of the plan, enhancing the overall functionality of the water management system.

ALİAĞA ORGANIZED INDUSTRIAL ZONE, ROAD NUMBER 19-07 CONSTRUCTION

The project also involves excavation work, including drainage works to ensure proper water management. Earth reinforcement and backfilling will be carried out to stabilize the structure. Facade panels will be installed for aesthetic and functional purposes, while steel strips will be used for additional reinforcement. Finally, road construction and landscaping will complete the project, enhancing both the infrastructure and the surrounding environment.

Burdur Yeşilova Flood Protection 4th Group Construction

The Burdur Yeşilova Flood Protection 4th Group Construction project involves the construction of a 2500-meter stone-walled canal designed to manage floodwaters effectively. It includes the installation of 3 termination benches to control flow, as well as 8 culverts to facilitate water passage. Additionally, a 250-meter grilled system stonewall channel will be built to further enhance the flood protection system and ensure proper drainage throughout the area.

Burdur Center Aziziye Kocapınar Pond and Irrigation Work Manufacturing

The project includes the construction of a clay core rock fill pond, designed for efficient water storage and management. A spillway will be incorporated to control overflow, while regulators and tersip clauses will be installed for precise water flow regulation. A relay path will be developed for access and maintenance. Additionally, the irrigation system will cover an area of 309 hectares, utilizing PE pipe irrigation for effective and sustainable water distribution across the land.

five yellow hard hats on gray surface

Contact Us

Get in touch with our construction specialists today to build the foundation for your next successful project.